CONTACT

Wednesday, September 4, 2019

Time

10:00 am - 01:00 pm

Hall

World Trade Center (Floor Mezzanine)

Room

Tajin

Add to calender

Workshop: Point of Interconnection

10:00 am
01:00 pm

Point of Interconnection

  • Karo Fernández
    PV Technical Training and Curriculum Development, Solar Energy International, U.S.

Speakers

 Karo Fernández
Karo Fernández
PV Technical Training and Curriculum Development, Solar Energy International, U.S.

Summary

Advanced Level


Get insight on the most updated rules-of-the-game for designing the point of interconnection (POI) for a grid-tied PV system according to NEC 2017 (and learn about what may be updated for the next revision of NOM-001-SEDE-2018!). NEC 2017 POI requirements include sections that can greatly benefit your PV designs. In this class we present them through diagrams, examples and calculations in real sizing situations. Learn how to size distribution panels based on PV watts being installed, or understand the limitations in sizing a PV systems according to existing panels; learn how to size panels connected in series and panels for parallel connection of many inverters in large solar farms.


Participant will receive 3 NABCEP CE credits and an SEI Certificate of Participation.

Workshop language: Spanish


Workshop Price: $3,750 (Registration)

Workshop Partner

Workshop Partner